1 Pursuant to the design document, the pressure test for piping system shall be conducted after the completion of piping erection and heat treatment as well as passing the nondestructive examination.

  • 1管道系统压力试验,应按设计文件要求,在管道安装完毕、热处理和无损检测合格后进行。