3 To give the bidder enough time to study changes to the tender document when writing the bid document, the tenderee may extend the bid closing date at its own discretion.
英
美
- 3为使投标人编写投标文件时有充分时间对招标文件的修改部分进行研究,招标人可以自行决定,酌情延长投标截止日期。