APPLICATION OF THE TWO-DRILL ONE-CLAMSHELL METHOD WHICH CAN BE APPLIED TO BUILD THE CUTOFF WALL OF PLASTIC CONCRETE IN THE STRENGTHENING ENGINEERING OF HUANGJIN RESERVOIR

  • 两钻一抓法造塑性砼防渗墙在水库加固工程中的应用
目录 查词历史