According to the faults and defects found in the process of trial operation and commissioning of 300MW circulating fluidized bed(CFB) boiler,the solutions are put forward.

  • 结合300MW CFB锅炉的试运和调试过程中发现的一些故障和缺陷,提出了解决措施。
目录 查词历史