According to the type structure of height-changing section, we used the steel-form jackplane to conduct concrete lining of first bottom slab and then side and top arch concrete lining way.

  • 根据变顶高段形体结构,采用先底板、后边顶拱钢模台车混凝土衬砌方式。
目录 查词历史