您要查找的是不是:
- Adjustment Screw Locknut 调节螺钉防松螺母
- J. Vertical Shaft Fine Adjustment Screw. 垂直杆微调螺丝.
- Tighten adjustment screw to 3 N·m (30 in-lbs) torque. 拧紧调整螺丝到3 N·m (30 in-lbs)扭力。
- Loosen the adjustment screw, and adjust the length of the link rod. 请拧松调整螺丝,拔出或插入连接杆进行调整。
- Firmly screw can on adapter, and turn the flow adjustment screw. 将料罐倒置与喷枪连接,旋转打开流量阀,调节流量。
- To replace seat/ stem module shut off supply, loosen locknut and back off adjusting screw. 要更换阀座/杆模块,先关闭供应管道,松开锁紧螺母,退出调节螺丝。
- To replace seat/stem module shut off supply, loosen locknut and back off adjusting screw. 要更换阀座/阀杆模块,先关闭供应管道,松开锁紧螺母,退出调节螺丝。
- To clean strainer or replace seat/stem module shut off supply, loosen Locknut and Lock Seal and back off Adjusting Screw. 要清洗过滤器或更换阀座/阀杆模块,先关闭供应管道,松开锁紧螺母和锁紧密封,并且将调节螺丝退出。
- If valve clearance needs to be adjusted, loosen the locknut on rocker arm adjusting screw.Turn adjusting screw until feeler gauge slips with a slight drag. 如果气门间隙需要调节,松开摇臂调节螺丝上的防松螺母,转动调节螺丝直到测隙规滑动时稍带阻力为止。
- Remove adjuster lever, adjuster screw and spring. 拆卸调整器杆,调整器螺丝和弹簧。
- The high step moves from under the adjusting screw. 使高点从调节螺钉下移动。
- Presser foot adjustment screw graved with graduation makes digital pressure control easy and precise. 压脚调节螺栓上刻有刻度,数字化调节更易控制压脚压力,因此,压脚压力可轻松而准确的重设。
- The adjusting screw rests on the high step of the cam. 调节螺钉落在凸轮高点上。
- Keeping well away from the propeller, adjust the engine to maximum rpm with the mixture adjustment screw marked with an "H". 跟螺旋桨保持距离;推油门全开.;转进标记"H"螺丝求取最高转速。
- Adjustment of parallelity, adjust screw (6), you can set the parallelity between printing squeegee and ink-collecting squeegee. 平行度调整:调节螺丝(6),可调整刮墨刀、回油刀与丝网的平行度。
- To Readjust- Loosen lock nut on the adjusting screw. 重新调节:松开调节螺丝上的锁定螺母。
- Lubricate adjuster screw threads and pivot with spray lube. 使用喷雾润滑油润滑调整器螺丝螺纹和枢轴。
- To Readjust - Loosen lock nut on the adjusting screw. 重新调节:松开调节螺丝上的锁定螺母。
- To replace seat disc or diaphragm loosen locknut (51) and back off adjusting screw (53), remove four bonnet screws (24) and lift off cage (3) with spring (729) and washer (61). 要更换阀座阀瓣或隔膜,则松开锁紧螺母(51)并退出调节螺丝(53),拆卸四个阀盖螺丝(24)并将带着弹簧(729)和垫圈(61)的笼(3)。
- Tie-Rod of Marble Gang Saw with hydraulic driven is for connecting hydraulic tensioner and saw blade. It composes of Rear Tie-Rod, adjust screw and wedge. 大理石框架锯液压锯夹用于连接液压涨紧器和锯条,它由前后锯夹,蝴蝶板、插板和调整螺杆组成。