After drilling and reaming, we may pump the slurry into the expected open-hole productive zone where sand is probably produced in order to put up the initial sand control.

  • 可以将该高渗透水泥在钻井和扩眼后泵注到可能出砂的裸眼层段进行先期防砂;
目录 查词历史