After enlarged excavation in front of the plug and be grouted,the plug under water load is actually a rigid body restrained by the surrounding rock.

  • 经过对堵头前端扩挖并进行灌浆等处理后,堵头在水荷载作用下实际上是一个四周受围岩约束的刚体,它的超载能力很强。
目录 查词历史