An analysis project was conducted by the Krones Line Tuning Team for Filling Line No. 3 to improve the efficiency or the OEE (Overall Equipment Effectiveness).
英
美
- 克朗斯生产线调试队的分析任务是:如何提高第三条灌装线的功率以及设备整体效率(Overall Equipment Effectiveness)。