An optimal design of the prestressed box maingirder in a 10-ton and 10-metre gantry crane was made,with the SUMT method applied to the work.
英
美
本文应用SUMT法对10吨10米预应力桥式起重机的预应力箱型主梁进行了优化设计。
目录
查词历史
英 汉