Analyses the technological parcticability and economic advisability on local villages and towns coal mine with the technology of 10 kV direct power coal mine with the technology of 10 kV direct power supply under the mine.
英
美
- 论述了地方、乡镇煤矿10 kV电源下井供电的技术可行性、经济合理性。