And by testing especially, the conclusions are got that the blasting boreholes must be stemmed.The complex stemming are composed of water and breakstone is the best stemming method in stemming method.

  • 在堵塞方法选择中,水、碎石组成的复合堵塞是最优堵塞方法。
目录 查词历史