At the same time, this model supposes information on demand during lead time is imperfect and lead time can be controlled and reduced at an added cost.
英
美
- 同时,模型假设有关零售商提前期内需求的信息是不完全的,并且提前期可以由追加额外的赶工成本进行控制。
