Based on the engineering geological conditions of the slip-mass on the left bank of Zhangfeng Reservoir, this paper puts forward the concrete design plan for the slip-mass scupper.
英
美
- 根据张峰水库左岸塌滑体的工程地质条件等,给出了塌滑体排水洞的具体设计方案。