Based on the framework, an algorithm, GA\|SPTS, is developed for job shop scheduling problems with sequence dependent setup times, which shows high performance compared with the existing algorithms.

  • 在以上框架基础上,针对含调整时间的作业排序问题建立了一种混合算法GA-SPTS,通过与已有算法的比较表明,该算法对这类问题具有很好的求解性能。
目录 查词历史