Based on the third phase of the project in Dexing Copper Mine,the whole designed cause of the huge cantilevered structure for belt conveyors is discussed.

  • 通过德兴铜矿三期工程实例,对较高大的钢结构悬臂胶带运输机栈桥的设计过程做了系统地论述。
目录 查词历史