Because of its peculianties in design and construction, Gonghe cable-stayed bridge adopts the second stretching method as the cable force controlled method and succeeded at last.

  • 公和斜拉桥因其结构和施工的特点,在施工中采用了“二次张拉到位”的索力控制方法,并最终取得了成功。
目录 查词历史