Because the rock quarrying and filling are greatly influenced by the climate, the construction method and quality control are the most key link in the construction of rockfill dam.

  • 由于堆石料的开采与填筑等施工受气候的影响较大,因此施工方法和质量控制是最关键的环节。
目录 查词历史