By studying some boring machining families,standard time datum for unit operation was set up.Some methods of shortening operation changing time were also presented.

  • 通过对钻孔加工族的时间研究,初步建立不同工步单件加工时间的标准资料,并探讨节省作业转换时间的方法。
目录 查词历史