By the new general procedure based on optimization technique, the optimal capacity, the optimal location and the optimal switching on-off time of fixed and switchable shunt capacitors, are solved.

  • 提出的基于优化技术的通用计算程序可求解最佳固定和可调电容器组容量、最佳安装位置、最佳投切时间。
目录 查词历史