Centerline discharge pump casings are not acceptable. The pump casing shall have an integrally cast hand hole supplied with a hand hole cover.

  • 中心线排放泵壳是不可接受的。泵壳上应该具有整体铸造的探孔,并配置探孔罩盖。
目录 查词历史