您要查找的是不是:
- Central Test Control 中央测试控制
- The Administer Test Controller dialog is displayed. 随即出现“管理测试控制器”对话框。
- Load test plug-ins allow for custom load test control, such as, aborting a load test when a counter or error threshold is met. 负载测试插件允许使用自定义负载测试控件,如在达到计数器或错误阈值时中止负载测试。
- A test rig is made up of a test controller and one or more agents. 测试远程测试机组由一个测试控制器和一个或多个代理组成。
- Click Close in the Administer Test Controller dialog box. 在“管理测试控制器”对话框中单击“关闭”。
- The Administer Test Controller dialog box is displayed. 将显示“管理测试控制器”对话框。
- In view of test control malpractice and the basis existing test basic flow has designed the test question examination paper management system management system. 针对考试管理的弊端,并根据现有考试的基本流程设计了试题试卷管理系统。
- Fixture and the test control system been used to adjust the calibration recall or preventive maintainance schedules to eliminate out of tolerance conditions? 量规,夹具和检测控制系统的日期已经调整符合为排除公差条件的标准取消或者预备维修日程了嘛?
- Fixture and the test control system been used to adjust the calibration recall or preventive maitenance schedules to eliminate out of tolerance conditions? 预定日期以及测试控制系统是否已经用于调整校准或者用于预防性的维护来去除公差。
- The practice shows that it can not only make the test control program more succinct, but largely improve the design efficiency, expansibility and universality of ATE. 实践表明,测试信息的独立规划,不仅使测控程序更简洁,而且能大大提高自动测试设备的通用性、扩充性以及研制效率。
- A computer CIP control system was worked out on the basis of analysis on present CIP control system in China ,combined with concentration test control for acid,alkali. 在分析目前国内乳品厂原地清洗控制系统的基础上,结合酸、碱、盐离子浓度检测控制仪,研制出基于工业控制计算机的CIP设备监控系统。
- CEAEC is located in the Jiading campus of Tongji University, which is composed of the central office building and central testing and trial-producing bases. 工程中心坐落在同济大学嘉定校区内,由中心办公楼和中心试验试制基地两部分组成。
- There should be no firewall between the test agents and the test controller. 测试代理和测试控制器之间不应有任何防火墙。
- The Administer Test Controllers dialog box does not do this for you. “管理测试控制器”对话框不能帮您完成此操作。
- United States Army Central Test Activity 美国陆军中心试验站
- Central Test and Evaluation Investment Program 中央试验与评估投资方案
- Central Test Technology Coordinating Office 中央测试技术协调处
- Present the basic similarity simulation principle followed in cold simulation of power plant boiler dynamic field, way of calculating test control parameters and associated measuring techniques. 介绍了电站锅炉空气动力场的冷态模化的基本相似模化原理、试验控制参数的计算方法及相关的测量技术。
- Using IEEE P1500 and similar CTW (core test wrapper) designs, test control mechanisms and corresponding TAM (test access mechanism) constructed SOC test architecture becomes more and more popular. 在SOC中应用IEEE P1500测试设计规范以及其它类似的测试设计技术,确定核测试包封设计、测试控制机制以及测试访问机制,实现测试结构框架的方法已经被普遍采用。
- Such values are central to our way of life. 这些价值对于我们的生活方式是至关重要的。