Chapter threefocuses on designing the form of Activity Based Cost System (ABCS), which iscomposed by the ABC, ABCM and performance value system.
英
美
- 作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。