Comparing with conventional dam, Longtan RCC dam was constructed with large placement section and large water demand, therefore, water cooling system for dam body is somewhat different.
英
美
- 而龙滩大坝碾压混凝土施工仓面大,用水量大,与常态混凝土大坝通水冷却略有不同。