Connection between handrail and platform beam shall be welding. It shall be 8mm weld around the base plate of past on side.There shall be gap for water outlet.

  • 立柱与扶手管、横杆间采用销钉固定或焊接固定的方式,具体的连接方式见后面的的详细要求。
目录 查词历史