您要查找的是不是:
- This is a load control forms of code. 这是一个控制窗体加载的代码.;-
- Line |1: All controls must precede menus; cannot load control |2. 行 |1:所有的控件都必须优先于菜单;无法加载控件 |2 。
- For example, when you run a smoke test on a Web application, you might want to set a light, constant load of 10 users. 例如,对Web应用程序运行冒烟测试时,可能要设置一个较小的、10个用户的恒负载。
- On the Load Pattern page of the Load Test Wizard, select either Constant Load or Step Load. 在“负载测试向导”的“负载模式”页上选择“常量负载”或“分级负载”。
- The fracture of constant load tests was transgranular SCC mode, whereas the SSRT fracture surface was tough and without SCC fracture characteristics. 但两种方法中渗铝试样的断口形态表现出差异:恒载荷试验为穿晶型SCC断口,而SSRT无SCC断口特征,为韧性断口。
- The ART reagent is added to the pair,and then the frication experiment is carried out by constant load and velocity under air condition. 在摩擦副中加入ART试剂,在一定载荷、一定转速条件下在大气环境中进行实验。
- A control system includes an electrical load control device responsive to radiant energy and a transmitter. 一种控制系统包括一响应于辐射能的电力负载控制器件及一发射机。
- The ART reagent is added to the pair, and then the frication experiment is carried out by constant load and velocity under air condition. 在摩擦副中加入ART试剂,在一定载荷、一定转速条件下在大气环境中进行实验。
- Elster Metering's products include electricity, water and energy meters, metering systems, and load control solutions. 埃尔斯特集团公司产品包括电表、水表、能量表、表计系统和负荷控制。
- The load control device resides on a digital communications link and receives infrared commands via a lightpipe. 该负载控制设备驻留在数字通信链路上,并且经由灯管接收红外命令。
- Usage: This apparatus is to determine the ability for the materials of man-made slings so lings to withstand compression under a constant load for a period of time . 本机系用来测试泡棉在一定时间内持压的抗压性,藉由外力消除后,泡棉的伸缩性来间断其品质的良劣。
- Methods The eigenvalue of sEMG during elbow joint moving under constant load were calculated with means of root mean square(RMS)and integrated electromyogram(iEMG)in time domain. 方法在手握恒定目标力量时提取表面肌电信号,并分别从时域采用均方根和积分肌电值方法提取肌电信号的特征值。
- Electricity metering equipment (a. C.) - General requirements, tests and test conditions - Part 21: Tariff and load control equipment. 电量测量设备(交流)。一般要求、试验和试验条件。第21部分:资费和负荷控制设备。
- All of the above will be a basis for the studies of flow load control, power supply recovery and damage loss mitigation of power system after earthquake. 该工作可为震后电力系统负荷快速调整、震区供电系统较快恢复电力供应,减少供电工程系统的损失提供理论分析依据。
- H.-T. Yang and K.-Y. Huang, “Direct load control using fuzzy dynamic programming”, IEE Proc.-Gener. Transm. Distrib., Vol. 146, No. 3, May 1999. 张明吉,“冷气机之节约电力需量控制法则”,电机月刊,第九卷,第七期,页244-249,七月,1999。
- H.-T.Yang and K.-Y.Huang, “Direct load control using fuzzy dynamic programming”, IEEE Proc.-Gener.Transm.Distrib., Vol. 146, No. 3, May 1999. 杨正光,陈嘉裕,“直接控制负载管理策略应用”,台电工程月刊,第584期,页82-96,民国86年4月。
- His wife was a constant inspiration to him. 他的妻子经常鼓励他。
- The paper analyzes the problems about power sources input point in load control unit and the uncompatibility of facilities of different factories. 分析了目前负荷管理系统存在的负控终端电源引入点问题、不同厂家之间的设备不能相互兼容问题等,提出了加以改进的设想。
- MIRANDA EP0 is recommended for uses in high constant loads and severe shock loading conditions. 万灵达EP0推荐应用于高稳定负荷及振动负荷的场合,
- During the second stage, the excess pore pressure was dissipated under the constant loads. 固结阶段,土体在恒定荷载作用下,超孔隙气压和超孔隙水压逐渐消散而固结。