- Furthermore, a project budget and Cost Breakdown Structure are developed and mapped to the OBS and WBS. 此外,专案的预算与成本分解结构也须加以发展并与OBS和WBS作对应。
- Pls show me the cost breakdown to identify your cost structure. 请给我你们的费用分解表,以识别你们的费用结构。
- Cost Breakdown Structure 成本分析结构
- Did you prepare a cost breakdown? 费用的清单你准备好了吗?
- What is a work breakdown structure? 什么是工作分析结构?
- CWBS Contract Work Breakdown Structure? 合同工作分解?
- Create a work breakdown structure from tasks in Microsoft Project. 在Microsoft Project中基于任务创建工作分解结构。
- Create the work breakdown structure with the team to develop the cost, schedule, resource, quality and procurement plans. 和团队一起建立工作分解结构,并开发成本、进度、资源、质量和采购计划。
- Comprehending WBS and work breakdown structure system. 5理解WBS及工作分类结构系统;
- In SAP there are threetypes of cost objects: Cost Center, Internal Order, and WBS(Work Breakdown Structure) Element (see below for definition). 在SAP里有三种成本对象:成本中心、内部订单、WBS要素(项目管理)。
- What is the cost breakdown including primary costs or transfer prices? 包括主要成本和转移定价的成本分类是什么?
- Subassemblies residing in inventory are valued as 100% material, regardless of the MLO cost breakdown. 库存半成品成本只计材料费用,不按照MLO的成本要素进行细分。
- Work breakdown structure is the basis of project controlling and the model of duration-cost is put forward with the analysis of time and cost. AHP and FCE is used to weigh the risk of project cost, which is the basis of risk controlling. 工作分解结构是项目控制的基础,通过时间成本的权衡分析,提出了工期-成本的数学模型:针对工程项目的成本风险,用层次分析法和模糊综合评价法衡量项目成本风险,为风险控制提供较好的依据。
- In project management, a work breakdown structure (WBS) is a method for analyzing a project's activities. 在项目管理中,工作分析结构(WBS)是用来分析项目活动的方法。
- A Microsoft Visio drawing is created that is a work breakdown structure chart of the tasks. 将创建一个Microsoft Visio绘图,该绘图是任务的工作分解结构图。
- A typical tool that is used by project managers is the work breakdown structure (WBS). 项目经理使用的典型工具是工作分解结构(WBS)。
- Space project management - General requirements - Part 2: project breakdown structure. 太空项目管理。一般要求。第2部分:项目取消方式。
- NPI Project leader will create WBS (work breakdown structure) with team member ASAP. 新产品导入领导人将和小组成员一起创建工作分解结构,明确职责。
- To map roles to persons is a main task for the project manager once the work breakdown structure has been defined in the abstract. 在工作分解结构抽象定义之后,将角色映射到人就是项目经理的主要任务。
- With Project, you can represent the work breakdown structure by using task IDs or by assigning your own WBS code to each task. 使用Project,可通过使用任务标识号或者向每项任务分配自己的WBS代码来表示工作分解结构。