Deformation errors of the main girder and the cable tower should be eliminated through adjusting the cable force of all hangers, to get the satisfied force errors.

  • 而对于主梁和索塔的变形误差,则需要进行全桥吊索索力的调整加以消除,以获得令人满意的吊索索力误差。
目录 查词历史