您要查找的是不是:
- Director Program Evaluation 计划评估处处长
- Ensures that a program evaluation is conducted. 确保培训评估工作的顺利进行。
- Through the harangue, pass overall program evaluation consistently. 经过热烈的讨论,一致通过总体方案评审。
- Also sometimes called a PERT (Program Evaluation and Review Technique) chart. 有时也称为PERT(计划评估与评审技术)图。
- Conduct site inspections and program evaluations. 进行现场视察和项目评估。
- Social Network Analysis In Program Evaluation: New Directions For Evaluation, No. 网络分析:评估进展新方向。
- Evert. Vedung Public Policy and Program Evaluation Transaction Publishers Feb 2000. 转引自.;面对权力的规划
- This paper describes the application potential and the feasibility of program evaluation and review technique in application software development. 本文论述了计划评审技术(PERT)在应用软件开发中的应用价值和可行性。
- Gredler, M. E. (1995) . Implications of Portfolio Assessment for Program Evaluation, Studies in Educational Evaluation, Vol. 21.pp.431-437. 比尔·约翰逊:《学生表现评定手册》,李雁冰主译,华东师范大学出版社2001年版,第71页。
- Royse, D., Thyer, B.A., Padgett, D.K., &Logan, T.K. (2001). Program evaluation: An introduction. Belmont, CA: Wadsworth/ Thomas Learning. 张英阵(2002)方案设计与评估。草屯:内政部社会福利工作人员研习中心。
- Then the thesis puts forward a fuzzy program evaluation and review technique.The technique imports fuzzy concept into PERT. 针对产品开发的特点,提出了一种模糊计划评审技术,该技术将模糊概念引入到计划评审技术中,可提高进度计划的精确度。
- Program evaluation Evaluation of a set of interventions, marshaled to attain specific global, regional, country, or sector development objectives. 相关术语:局部评估 计划评估 计划评估是对一组开发活动的评估,旨在达到特定的 全球性、地区性、国家或部门的开发目标。
- This article estimats the risk in project plans with PERT (program evaluation and review technique) net technique.It provides a base for controlling project plans. 本文采用pert(计划评审法)网络技术对工程计划进行了风险估计,为工程计划控制提供了依据。
- The new director will shake up the company. 这位新董事长将对该公司进行改组。
- Am I really fitted for the role of director? 我真能胜任董事一职吗?
- Our sales director is unlearned. 我们的销售部主任没有文化。
- The paper establishes a logistics park construction risk evaluation model based on PERT(Program Evaluation and Review Technology). The entire logistics park construction risk is described by the project complication probability and an example is given. 针对物流园区建设项目各阶段持续时间不确定性的特点,为考虑项目时间因素对整体风险的影响,基于计划评审法(PERT)建立了物流园区建设风险评价模型,通过项目不同风险水平的完成概率描述物流园区建设的整体风险状况,实例研究表明该方法为物流园区建设风险评价提供了一种有效的管理工具。
- I wouldn't advise you to go against the director. 我反对你和经理对着干。
- Director Liu, in the chair, opened the meeting. 刘厂长主持会议,宣布开会。
- On the other hand, the program evaluation and review technique (PERT) produces estimates of project duration based on the path with the longest mean time but ignores the influence of other paths. 计画评核术(PERT)则以平均最长路径,来估计需要时程要径,但忽略网路中其他路径对于总工期之影响。