Due to the disturbed flow at bridge pier, the original condition of flow and bed scouring and sedimentation was changed, and thus the navigation condition was affected.
英
美
- 摘要建桥后由于桥墩扰流,改变了原有的水流条件与河床冲淤条件,从而影响到原有的通航条件。