Due to the high water head of the GHS, the design unit put forward a suggestion of using the pre stressed reinforced concrete spiral case.

  • 高坝洲水电站由于设计水头较高,设计单位建议采用预应力钢筋混凝土蜗壳。
目录 查词历史