Due to the large size of the deaerator water tank of a nuclear power station,in-situ welding is required for 2 ring butt welds,causing difficulties in welding and heat treatment.

  • 某核电站除氧器水箱尺寸较大,其2条环焊缝需在现场拼焊,焊接和热处理难度很大。
目录 查词历史