Due to the line of the project is longer, owing to the limitation of the historical condition, the drainage system is divided into diverging system and combined system.

  • 由于工程所处的线路较长,受历史条件的限制,排水体制有分流制及合流制之分,每个排水段排向错综复杂,制约条件较多。
目录 查词历史