During casting internal and external formwork are conneced together using tie forms, n.2 bars diam. 15mm every 1.5 m.

  • 浇注混凝土过程中,内模,外模用穿墙螺栓连接,每1.;5米设15毫米螺栓2条。
目录 查词历史