During construction of the foundation ditch of circulating water pump house of Xiefu Power Plant, a support collapse accident occured because of change of design and too hurried construction.
英
美
- 协福电厂循环水泵房基坑施工,因变更设计和追求进度造成支护崩塌事故,全文简述事故经过和处理方法。