During the high-loading period in summer, the vacuity of condenser in No.2350? MW unit of Sanhe Power Generation Company was low so that the spare vacuum pump was taken into combined operation.
英
美
- 三河发电公司2号350mw机组在夏季大负荷时,凝汽器真空度低,甚至造成备用真空泵联动。