During two tanks construction, the main equipment includes five tower cranes, three placing booms and two elevators.The construction needs large power supply, power coefficient is great.

  • 主要的施工设备为五台塔吊,三台布料机以及二台升降机等,施工的主要特点是用电负荷大,施工用电需要系数大。
目录 查词历史