Dynamic programming is adopted to carry out real time dispatch in hydroelectric by the optimal criteria of economic benefit.

  • 以运行水电站经济效益最大作为优化准则,采用动态规划方法对其进行实时调度,从而实现其经济运行调度。
目录 查词历史