您要查找的是不是:
- Application and research of crack-resistant measures for face slab concrete of dam for Hongjiadu Hydropower Station 洪家渡水电站面板混凝土防裂措施研究及其应用
- Construction technology control for stage I face slab concrete works of Hongjiadu hydropower station 洪家渡水电站一期面板混凝土施工工艺控制
- Investigation of crack resistance of face slab concrete incorporated with expansive agent and polypropylene fiber 面板混凝土补偿收缩与纤维增强的阻裂试验研究
- Improving Curing Measures to Control Contraction-caused Deformation of Face Slab Concrete 加强养护措施控制面板混凝土收缩变形
- Face slab concrete 面板混凝土
- The crushing side wall is used the upstream consolidation slope measures of rockfill dam with concrete face slab. 混凝土面板堆石坝采用挤压边墙作为大坝上游固坡措施。
- With the development of concrete face slab dam, the upstream slope construction is a key factor affecting the schedule and quality of construction. 在混凝土面板坝的发展过程中,上游坡面的施工始终是一个控制进度和影响质量的关键环节。
- The paper introduces the concrete face slab fissures and defects in Xiaoshan hydropower station as well as its repairing material and method. 文章详细介绍了小山水电站面板混凝土裂缝与缺陷修补加固用材料、修补加固方法。
- Strictly control the total deformation of dam body, especially the deformation after reservoir impoundment, is the most effective measure for avoiding concrete face slab rupture. 严格控制坝体的总体变形,特别是控制蓄水运行后的坝体变形,是避免出现面板挤压破坏的最有效手段。
- The volume of slab concrete in CCTV main building reaches 120 000m~3,and the thickness of concrete is 10.9m. CCTV主楼底板混凝土达到了12万m3;厚度达到10.;9m。
- The concrete for face slab is designed to have an age of 28 days, the strength grade of C25, the frost resistant grade of D100, and the impermeability grade of S12. The single layer steel bar is arranged in the middle part of face slab and in the plinth. 面板混凝土设计采用28d龄期,其强度等级为C25,抗渗等级S12,抗冻等级D100,单层钢筋布置在面板的中间;
- The main dam of the upper reservoir of Yixing Pumped Storage Power Station is a rockfill mixed dam with reinforced concrete face slab built on the inclined construction foundation surface. 摘要江苏宜兴抽水蓄能电站上水库主坝是建在倾斜建基面上的钢筋混凝土面板堆石混合坝,该坝型为国内外罕见。
- Concrete face slabs are constructed in two stages with railless slipforms. 混凝土面板施工分两期,采用无轨滑模。
- The face slab rockfill dam of Shuibuya Hydropwer Station is the highest one being built in the world at present. 水布垭水电站混凝土面板堆石坝,属目前在建的世界第一高面板堆石坝。
- General speaking,the design of face slab includes plinth,face slab,perimeter joints,vertical joints and horizontal joints. 面板作为面板堆石坝的挡水结构,在面板堆石坝设计中占有重要地位。
- Study on anti-crack behavior of concrete face slab 面板混凝土的抗裂性能研究
- rockfill dam with concrete face slab 面板堆石坝
- cracking control measure for concrete face slab 面板防裂
- Based on the design of Hanpingzui rockfill dam with concrete facing slab, the stresses and deformations of the dam body and impervious system are calculated by using the elastoplastic plane finite element method. 摘要根据汉坪咀混凝土面板堆石坝的工程设计,用弹塑性平面有限元法,计算了堆石坝坝体、防渗体系的应力和变形。
- It is a fact of life and you must face it. 这是严酷的现实,你必须面对它。