For Construction and Turnaround Activities, all scaffolding shall be inspected at least once before each work shift or more periodic as determined by the scaffold inspector.
英
美
- 关于建筑和检修活动:所有脚手架都要在每个轮班之前检查一次或者根据脚手架检查员的决定进行周期更短的检查。