From the Pareto optimal solution a relation curve between control performance and process margin was obtained, and the higher the control performance was required, the more the margin was needed.

  • 求解得到非劣解集,绘制关于控制性能指标和工艺指标的关系曲线,发现系统对控制器性能的要求愈高,所需要的裕量应愈大。
目录 查词历史