However, due to its specialty in fabrication process, this kind of pile has the transfer length issue similar to those prestressed concrete members with pretensioning method.
英
美
- 然而由于大管桩制作工艺的特殊性,使其具有类似先张法预应力混凝土构件的预应力传递长度问题。