您要查找的是不是:
- Hydraulic test in power plant 火力发电厂水压试验
- FGD Technolgy of Boilers in Power Plant of TISCO. 太钢发电厂锅炉的烟气脱硫技术。
- THE RESEARCH ON APPLICATION OF HYPOTHESIS TESTING IN POWER PLANT DCS/FCS ACCEPTANCE TEST 假设检验在电厂DCS/FCS验收中应用的研究
- Hydraulic Test Method for Circulating Pipe in Thermal Power Plant 火电厂循环水管水压试验方法
- Cylinder to be hydraulically tested in face of C/E and surveyor. 气缸需在轮机长和验船师在场时进行液压试验。
- Cylinder to be hydraulic tested in the presence of C/E and surveyor. 气缸须在轮机长和验船师在场时进行液压试验。
- The FCB test procedure and its key point were analyzed in detail,then the FCB test condition of unit 2 in Iran Sahand power plant was introduced. The reference value for similar test in domestic units is significant. 对FCB试验过程和试验要点进行了详细分析,介绍了伊朗萨汉德电厂2号机组FCB试验情况,对国内机组进行类似的试验具有一定参考价值。
- This paper introduces the corrosion mechanism and test method of steel-reinforced concrete citing the anticorrosion engineering of seawater desulfidation aeration tank in power plant, focusing on the organic coatings design and application methods. 以发电厂海水脱硫曝气池内防腐工程为例对钢筋混凝土建筑物的腐蚀机理和腐蚀检测方法作了介绍,并就曝气池表面涂装有机涂层的设计及施工方法作了重点探讨。
- Our business in power generation field covers Coal Fired, Combined Cycle, Wind Energy, Nuclear, Hydraulic power plants. 我们在电力行业的业务领域涵盖:燃煤电厂、联合循环电厂、风电场、核电厂以及水力发电厂。
- The results show that this device is suitable for high voltage test in large capacity,long distance XLPE cables and GIS in power grids. 现场试验结果证明,该试验装置用作大容量、长距离交联聚乙烯电力(XLPE)电缆、GIS等高电压电力设备的高压试验是非常合适的。
- The feedwater pump improvement project of steam turbine group200 MW in Power Plant has been implemented in1998. 某发电厂于1998年实施了200mw汽轮机组的给水泵改造工程,将电动给水泵改为小汽轮机拖动的汽动给水泵。
- The application of CPU222 PLC of Siemens S7-200 series to dynamic simulation test in power system is mainly introduced as well as the discussions about some practical problems. 主要介绍了西门子S7-200系列中的CPU222型可编程序控制器即PLC在电力系统动模试验中的应用以及对一些实际问题的探讨。
- Familiar with selection of piping material, pipe arrangement and so on in power plant, nuclear power plant. 熟悉火电、核电站管道材质选择、配管等技术。
- The feedwater pump improvement project of steam turbine group 200MW in Power Plant has been implemented in 1998. 摘要某发电厂于1998年实施了200MW汽轮机组的给水泵改造工程,将电动给水泵改为小汽轮机拖动的汽动给水泵。
- Water Balance Test in Thermal Power Plant 火电厂水平衡测试
- It also shows EJA series intelligent transmitter application trend in power plant. 并预测了其应用方向。
- Hydraulic test for L.O. pipe for stern tube. 艉轴管滑油液压试验。
- The Conservative Party is now in power. 现在由保守党执政。
- Finally, the developing trend on the basis of the current status of DEH Control System in power plant is deduced. 分析了各种方式的优缺点,并根据目前电厂控制系统的现状推断其发展趋势。
- On Unit's Load Dump Test in Zhuhai Power Plant 珠海发电厂机组甩负荷试验