您要查找的是不是:
- Hydraulic testing rig 液压试验台
- Connect to test rig and prepare for test run. 连接到测试装备和准备测试。
- The test rig of cavitation performance in water hydraulic control valve was first developed interiorly with higher pressure and larger flow. 而纯水液压技术本身所具有的介质来源广泛、环境友好、清洁安全的独特优势,则是纯水液压技术崛起的内在动力。
- Hydraulic test for L.O. pipe for stern tube. 艉轴管滑油液压试验。
- A test rig is made up of a test controller and one or more agents. 测试远程测试机组由一个测试控制器和一个或多个代理组成。
- Test Rig of Tractor Hydraulic Lift Capacity 拖拉机液压提升能力试验台
- Total productive maintenance of testing rig in collaboration with service personnel. 与维修人员一起测试装备的生产维护。
- The experimental investigations for of broken biennial root rate were made by a sugarcane cutter testing rig. 摘要利用甘蔗切割综合试验台,对影响甘蔗切割破头率的因素进行了室内试验。
- We must study the instruction before operation the pipe bender (hand pump, hydraulic testing pump). 在操作弯管机(手压泵、液压试压泵)之前,我们必须先学习说明书。
- Other Visual Studio Team System servers include build computers and Team Edition for Testers test rig servers. 其他Visual Studio Team System服务器包括生成服务器和Team Edition for Testers测试远程测试机组(Rig)服务器。
- For more information about Test Edition, see Test Rig Requirements for Team System. 有关Visual Studio Test Edition的更多信息,请参见Team System的测试远程测试机组要求。
- Administrators who want to install Test Edition and include a test rig will have additional hardware requirements. 对于希望安装Visual Studio Test Edition并包含测试远程测试机组(Rig)的管理员,将有其他硬件要求。
- Cylinders have to be subjected to inspection and hydraulic testing by the manufacturer before they can be put into service. 气瓶出厂前必须由厂家检验和水压试验。
- Team Foundation Build and the team's test rig (agents) are deployed to additional sever nodes. Team Foundation Build和团队的测试远程测试机组(Rig)(代理)部署到其他的服务器节点上。
- Cylinder to be hydraulic tested in the presence of C/E and surveyor. 气缸须在轮机长和验船师在场时进行液压试验。
- In addition, if you want to deploy a test rig across multiple languages, you must plan how to support those languages. 此外,如果您要在多种语言之间部署测试远程测试机组,则必须计划如何支持这些语言。
- This paper introduces in detail the thrust design and armored joint hydraulic test for PCCP restricted tubulation. 详细介绍了PCCP限制性管段止推设计和铠装接头水压试验的情况。
- A small air refrigerator test rig based on reverse Brayton cycle with foil journal bearings was rebuilt. 本文在原有试验样机的基础上,进行了必要的优化和改进,重新搭建了一套采用逆布雷顿循环,流量为30Nm3/h的小型空气制冷机系统实验台,重新设计了系统各部件:透平膨胀机,换热器和冷箱等。
- Huck rivet transverse vibration test rig is designed and developed to adapt mass coercive spot-check of railway truck. 为应对铁路货车铆钉质量强制抽验的要求,设计研制出哈克铆钉横向振动试验台。
- The hydraulic characteristics of transverse axis vortex behind the sill of the dissipater are studied with the hydraulic test. 摘要通过水力学试验方法,对跌坎式底流消能工坎后横轴漩涡的水力特性进行了初步研究。