In floating offshore operations, the choke and kill lines exit the subsea BOP stack and then run along the outside of the drilling riser to the surface.

  • 在进行浮动的海上作业时,节流和压井管线从水下防喷器组出来,之后沿钻井隔水导管外侧面到达水面。
目录 查词历史