In order to assure safe operation of the pile in winter ice zone,the strength analysis of the notched structure in the ice force should be checked.

  • 为保证桩腿在冬季冰区海域的安全使用,对桩腿结构进行冰载荷作用下的强度分析。
目录 查词历史