In other words, silt is pumped out of the water bed. Piles are then driven along the channel, and prefabricated sections of the tunnel are lowered into place onto the piles.

  • 换句话说就是从含水层中抽出淤泥,然后将沿沟槽打桩,再将预制的隧道段往下放在桩子上。
目录 查词历史