In the foundation pit works of Wafang Station of Tianjin Metro Line No. 1, the continuous wall was arranged to be constructed in winter according to the construction schedule.
英
美
- 天津地铁1号线下瓦房车站基坑工程中地下连续墙部分,由于工期的原因,安排在冬季施工。