In the process of round coal bunker construction,the interval distance problems are settled by the new ways of steel bar slip way,steel bar framework,and the like.
英
美
- 在圆煤仓施工中,通过采用钢筋滑道、钢筋骨架等新方法有效解决了仓壁钢筋间距等问题;