In the project construction such as plasterer, to assure flatness, lie between certain distance, make a elevation line, call mark muscle or strong anything resembling a tendon or vein.

  • 抹灰等项目施工中,为保证平整度,隔一定的距离,做一道标高线,称为标筋或冲筋。
目录 查词历史